Construction of a new waste water treatment works and sewer main in Postmasburg, in the Northern Cape. The exact co-ordinates are currently not available however the approximate area of location is, 28°18'33.4"S 23°06'30.3"E.
Beeshoek Mine has investigated opportunities for the continued and sustainable mining of iron ore reserves within the approved mining rights area near Postmasburg, Northern Cape. This application specifically gives effect the following projects: Specific demarcation of run of mine stockpiles on South
Construction of the 140MW Teekloof wind energy facility in the Ubuntu Local Municipality and the Pixley KaSeme District Municipality, 25km south from Victoria West, 40km north from Murraysburg and 40km west from Richmond in the Northern Cape. The exact co-ordinates are currently not available however
Construction of the 140MW Platberg Wind Energy Facility in the Ubuntu Local Municipality and the Pixley KaSeme District Municipality, 25 km south from Victoria West, 40 km north from Murraysburg and 40 km west from Richmond in the Northern Cape. The GPS co-ordinates are 31°36'38.9"S 23°23'22.3"E.
Construction of the Redstone solar thermal power project in the Northern Cape. The project features a molten salt energy storage technology, which is a first for South Africa, in a tower configuration which has the capability to support the country’s demand for energy when it’s needed most. The 100 MW
Construction of the Engineering Operations Centre (EOC) for the South African Radio Astronomy Observatory (SARAO) at Klerefontein, Northern Cape. The project value is R 302 635 800,36. The scope of works will include: SARAO will require the services of various specialists (Architectural including Structural)
Periodic maintenance and resurfacing on National Route R325 Section 2 from Postmasburg at km 0.00 to Jenkinsfarm at km 50.87 in the District Municipality of ZF Mgcawu, Northern Cape. The exact GPS location is not known and the marker has been placed on the R325 between the proposed areas of construction,
Periodic maintenance on National Route 12 Section 5 from Three Sisters at km 0.0 to Victoria West at km 60.80, Pixley ka Seme District and Local Municipality, Northern Cape. The exact GPS location is not known and the marker has been placed on N12 along the construction route 31°52'50.5"S 23°04'56.3"E
Periodic maintenance on National Route 10 Section 8 from Britstown at km 0.00 to Schilders Pan at km 61.64 in the Pixely ka Seme District Municipality, Northern Cape. The GPS marker has been placed along the proposed construction route 30°27'07.8"S 23°22'38.8"E.
Rehabilitation of Berwick 341 asbestos mine located in the Joe Morolong Local Municipality in the Northern Cape. CIDB 7CE GPS co-ordinates: 26°24'16.98"S and 23° 4'49.75"E