Alterations and additions to the existing Tembisa Hospital to be situated at 1 Flint Mazibuko Street, Tembisa, Johannesburg, Gauteng. R711 325 706,45. The GPS co-ordinates are : 25°58'58.1"S 28°14'27.9"E.
Far West Gold Recoveries (FWGR) operation in Gauteng. FWGR is being rolled out in a phased approach. Phase 1 included early-stage production, involving upgrading the Driefontein 2 plant to process tailings from the Driefontein 5 dump at between 400 000 t and 600 000 t a month, and depositing the residue
Construction of the Tembisa Burger King located on ERF 3914 at the corner of Botswana Road and Algeria Road in Thembisa, Gauteng. The scope of works involve demolitions of a public ablution block & taxi rank and construction of a new drive-thru Burger King, including dedicated parking bays. The GPS coordinates
Construction of a high-speed rail line connecting Johannesburg and the ports of Durban, with a total length of about 570 kilometers within South Africa. The exact GPS co-ordinates are not yet known however the GPS marker has been placed at the Gauteng Province, Lat -26.2707593, Long 28.1122679
Construction of the Rietfontein photovoltaic solar park and associated infrastructure and structures situated on Portion 229 of farm Rietfontein 128 IR in Springs, Gauteng. The solar park will have a maximum export capacity of 32MW and a footprint of 52ha. The GPS co-ordinates are 26°18'07.2"S 28°25'04.0"E
Construction of the Isondo Precious Metals Facility, on Portion 282 of the Farm Witkoppie No. 64 – IR, OR Tambo SEZ (Gauteng Industrial Development Zone), Bonaero Park, Kempton Park, Gauteng. The Facility will manufacture Platinum Group Metal (PGM) based Membrane electrode assemblies (MEA) and catalysts
Construction of 8 x 2 level blocks of about 40 units each to accommodate approximately 364 students on 9 100m² located at Land is Wealth farm lodge, Sterkfontein, Gauteng. CIDB 8GB . The exact GPS Coordinates are 26°00'44.7"S 27°41'34.2"E.
Construction of services and infrastructure for the Ennerdale South, Phase 2, located between Orange Farm and Lenasia South in Gauteng. CIDB 8 R40 to R130 million
The upgrading of surfacing on National Route N17 Section 2, from N3 at km 3.0 to Tonk Meter at km 33.45, in the Ekuhurleni Metropolitan Municipality, Gauteng. The contract value is R607 450 619.79. The exact GPS co-ordinates are not known and the marker has been placed along the possible construction